|
German Oil & Gas Technology :: Company News |
|
Directory
| Exhibition
|
New
Products |
Home
. |
Search for
German Oil & Gas Technology, Products & Services >>>
Visit the virtual
German Oil & Gas Exhibition >>>
|
+ + News + + + News + Update of PennWell Petroleum Conferences 2005 [more] Circulation of PennWells' new Petroleum Industry Buyers' Guide will increase 100.000 copies [more] Oil & Gas Journal: Over 80.000 paid subscribers in March 2005 [more]
|
A
48 MW thermo oil system for the oil production in China from HTT energy
systems In the course of the
continuously quick growth of the Chinese economy, the opening up of new
energy deposits is of outstanding importance. So also in the People’s
Republic of China, the change from the classic primary energy sources
hard and brown coal to oil and gas is of importance for the government
energy strategists in Beijing. Currently new oil fields are developped
with strenuous effort and in a breath-taking time offshore South China
and in the Bohai bay about 200 km east of Beijing. The
„Chinese National Offshore Oil Corporation“ (CNOOC) is a state owned,
market quoted company incorporated in 1982. In cooperation with foreign
partners, CNOOC assumes exclusively the exploitation of oil and natural
gases offshore China.
The
thermic energy demand of such a FPSO is quite high; it is between 30 and
50 MW depending on the construction size. Add to this there is a demand
for electrical capacity in similar scale. If the new developped oil
field disposes also about gas deposits worth mentioning, the concept of
a power/heat coupling (co-generation) could be taken for the total power
supply of a FPSO such as it is currrently realized by HTT energy systems
for the Bohai BZ 25-1 project.
Each
of these boilers can be operated in gas or diesel fuel mode. The
complete unit will be located in open area on deck which requires
special demands to construction details as well as corrosion protection. The
safety design of the HTT thermo oil system meets the large-scaled
requirements and has the approval by the classification company DNV (Det
Norske Veritas).
The
fivefold pump group (V= 390 m³/h, H = 110 m l.c.) is a made-to-measure
special construction with a weight of 20 to. Noteworthy is also
the extreme barely period for realization: Between the start of
engineering of the plant and the shipment to China there are only six
months. The HTT components will be shipped to China at the beginning of December, the platform leaves the dry dock of Shanghai shipyard at the end of January 2004. HTT energy systems
GmbH |
+ + Media Sponsors + |